I guess we shall start with photos from the beginning of the
project. The first basic layout and building, Hangar 18,
were done by Jason Terry of ARX, then tweaked and temp.
buildings, ramps etc added by Joshua Nyhus of ED.
Here we have the Red Hat hangars. These little
beauties were made by Jason Terry. Each Red Hat is different
in some way, just like they are in real life.

Hangar 4 |

Looking out from Hangar 7 at Hangar 4. |

Red Hats |

Hangar 4 |

Hangar 4 |
Next up we have the U-2 Hangars,
Shops and other little buildings on the north side of
the base which were left over from the 50s from the very
first project based at Groom Lake. These were made by
Joshua Nyhus.

Bldg. 217
"Base Machine Shop" |

Bldg. 220
"AGE Maint.Shop" |

Bldg. 224
"Vehicle Paint & Body Shop" |

Bldg. 222
"Base Battery Storage" |

Bldg. 230, 234 & 233
"Power Plant, Compressor Plant & Plant Cooling
Tower" |

Here's a photo of the north ramp area.

Here's a photo of the north ramp area looking south.

Here's a photo showing the south ramp area, here you can
see a nearly completed Hangar 18, completed Hangars
30-23, a completed Hangar 8 and nearly completed Hangars
9-16.

Another shot of the south ramp area, now looking north.

And a shot showing Hangars 20-23

Here's a photo of the Tower.

Photo of one of the dishes which is located on the north
side of the base.

Here's one of the dorms.
Lastly we have a few little
things left to show.
And that's where we stand, like I said
above, we still have a lot to do, but it's getting
there!